46) 12/31/2008 141261 PRJ: How to Interpret Message Received When You Open .mpx File
(141261) - If Microsoft Project comes across invalid data when you attempt to open an .mpx file, you receive error messages similar to the following: An error occurred during import (line #32) Work not valid Select Yes to continue, No to continue without error... 47) 1/5/2009 113650 PRJ: Original Name Remains on Menu after Renaming View
(113650) - In Microsoft Project, if you rename a table, view, or filter in your project file, the table, view, or filter with the original name is still available on the respective menu. 48) 1/4/2009 133208 PRJ: PasteLinks Not Re-established When Project Is Mailed
(133208) - When a Microsoft Project file contains OLE links and is sent as an attachment via a mail message, you may receive the following message when you open the attached project from the E-mail application: Cannot connect to link <path/link_id>. Do you want... 49) 1/4/2009 113001 PRJ: New Project View Replaces Existing Global View with Same Name
(113001) - In Microsoft Project, if you create a new view in a project file with the same name as an existing global view, the new view is saved in the project file, and the project uses this view instead of the global view. You do not receive an error message... 50) 1/2/2009 130964 PRJ: Inaccurate Shading of Nonworking Time
(130964) - In scaled views such as the Gantt chart, the nonworking time shading may be drawn incorrectly when there are large areas of consecutive nonworking time. Some areas, especially at the ends of the nonworking time, may be displayed as working time (that... 51) 1/4/2009 113447 PRJ: Scheduling a Project Based on a Task Start Date
(113447) - If you want a project's start and finish dates to be calculated based on the date for a particular task that occurs in the middle of the project (for example, if you have a task that requires a delivery of material before the task can begin, and you... 52) 1/5/2009 113694 PRJ: Resource Cost May Increase When Leveling
(113694) - After you level a project, the total cost of a summary task may increase. 53) 1/5/2009 124627 PRJ: Column Widths in Reports Appear Different on Screen
(124627) - If you adjust the column widths in a table on your screen, the column widths may not be similarly adjusted in a report that uses that table. 54) 1/5/2009 142443 PRJ: Hammock Task Defined
(142443) - How a hammock task is defined depends on the how the task is used in the parent project. 55) 1/1/2009 109414 PRJ: Linking Predecessor Field May Add Tasks Unexpectedly
(109414) - After you delete a task, it may reappear in the project with the same information and the following characteristics: it appears with a one-day duration, it is scheduled to start on the same day as the project's start date, and its Name field is left... 56) 12/27/2008 141733 PRJ: How to Build a Hammock Task
(141733) - A "hammock" task is dependent on external dates for both its start and finish dates and, ultimately, its duration. The name, hammock task, is derived from the way a hammock's shape is determined by the distance between the points to which it is... 57) 12/26/2008 44549 PRJ: Setting Dual-Pane View Generates Error
(44549) - When you create or edit a dual-pane view, dual-pane (combination) views are listed as options to be displayed in the top or bottom pane of a dual pane; therefore, selecting a dual pane results in a nested dual-pane view. Attempts to Set (use) this... 58) 12/23/2008 175457 PRJ: Troubleshooting Why Tasks Don't Schedule as Expected
(175457) - This article describes why a task may not be scheduled as expected and offers suggestions for correcting the behavior. 59) 12/4/2008 270139 PRJ: Description of the MPX Project File Exchange Format
(270139) - The MPX 4.0 file format is an ASCII file format that you can use to transfer project information between different versions of Microsoft Project as well as third-party programs that support the MPX file format, such as Primavera Project Planner and... 60) 12/31/2008 175458 PRJ: How to View Resource Availability Across a Resource Pool
(175458) - This article describes how to view resource availability for shared resources.